top of page
19_316_EBR_Masterplan_N5-scaled 2.jpg
GROVE ROAD & NORTHFLEET HARBOUR

Master Planning & Urban Design

Landscape Design: Chris Blandford Associates

Landscape BIM Execution: SKAB

Location: London, UK

Date: 2022

RIBA Stage: 0-4

Software:  Revit, Autocad, Adobe Suite

Demolition; enabling works, earthworks, underground services, highways and public realm.

Plan of Work
RIBA Stage 3 (Spatial Coordination)
RIBA Stage 4 (Technical Design)

1 Owen Street, Angel Southside, London , EC1V 7JW, UK

  • Google Places
  • Instagram
  • LinkedIn

©2024 by SKAB.

bottom of page